Project overview

JPS worked with AH2 Developments and Saer Architects on the redevelopment of the former Bull Bay Hotel site in Anglesey.

Following the demolition of the existing hotel in 2022, the scheme delivers nine contemporary two-bedroom self-catering holiday apartments and three three-bedroom self-catering houses. Designed to reflect the form of the previous building while introducing a modern architectural approach, the development maximises views across the Anglesey coastline through open-plan living spaces and Juliet balconies. 

JPS provided the structural design for the timber-framed new-build development, developing practical solutions to overcome the site’s challenging topography and existing underground structures.

The engineering challenge

The scheme presented several challenges, including:

 
  • Redeveloping the site of the former Bull Bay Hotel following its demolition.
  • Designing a new structure that reflected the form of the previous hotel while accommodating a contemporary architectural design.
  • Working within a sloping coastal site with varying ground conditions.
  • Addressing the presence of existing basement structures from the former development.
  • Developing foundation solutions suitable for the site’s constraints and construction requirements.
  • Coordinating structural requirements alongside the wider design team and contractor.
     

The engineering solution

JPS was responsible for:

  • Delivering the structural design for the new-build holiday apartment and housing development.
  • Designing efficient timber-framed superstructures to support the architectural vision of the scheme.
  • Assessing and responding to the challenging site conditions throughout the design process.
  • Developing innovative and effective foundation solutions to accommodate the sloping site and existing basement structures.
  • Working collaboratively with AH2 Developments, Saer Architects and DU Construction to support the successful delivery of the project.
  • Providing practical structural solutions that balanced buildability, performance and project objectives.

The outcome

  • A high-quality coastal development comprising nine two-bedroom holiday apartments and three three-bedroom self-catering houses.
  • Successfully regenerated the former Bull Bay Hotel site with a contemporary development that respects the character and form of the previous building.
  • Created accommodation that maximises coastal views through open-plan layouts and Juliet balconies.
  • Overcame challenging site constraints through effective structural and foundation design.
  • Provided a practical and buildable structural solution that supported efficient construction.
  • Enhanced the visitor accommodation offering within a prominent Anglesey coastal location

View similar case studies

Loggerheads Visitor Centre external

Visitor Centre

Loggerheads, Denbighshire

Spindles

Oldham

Oakfield House

Chester Zoo

Asiatic Lion Enclosure

Chester Zoo

Start your project with confidence

This field is for validation purposes and should be left unchanged.
Full Name(Required)