![](https://jpstructural.co.uk/wp-content/uploads/2021/02/Farndon-School-Cheshire-1.jpg)
![](https://jpstructural.co.uk/wp-content/uploads/2021/02/Farndon-School-Cheshire-2.jpg)
![](https://jpstructural.co.uk/wp-content/uploads/2021/02/Farndon-School-Cheshire-scaled-e1612432799809.jpg)
Project Info
JPS provided full civil and structural design services for the construction of this new-build teaching block at Farndon Primary School.
The design incorporated a steel frame with timber cladding and external works included additional play area and landscaping as well as modifications and upgrades to the drainage system.
Date | 2018
Client | Read Construction