Case Study

The Spindles

Location:

Menston

Project type:

New-build Residential Development

Project value:

£9 million

Client:

Gladman Retirement Living

Completion:

2023

Project overview

JPS provided the full civil and structural engineering design for this £9 million residential retirement development in Menston.

The scheme delivers 69 high-specification apartments with integrated care facilities, creating luxury independent living accommodation for residents.

Built on the site of a former public house, the development presented a number of ground engineering challenges, including difficult ground conditions requiring piled foundations and culvert diversions. The building structure was formed using load-bearing masonry construction with precast concrete floors supported on piled foundations, alongside communal, healthcare and welfare facilities designed to support residents’ wellbeing and long-term independence.

The engineering challenge

The scheme presented several challenges, including:

  • Redeveloping a former public house site with challenging ground conditions.
  • Designing a suitable foundation solution to accommodate poor ground conditions.
  • Managing the diversion of existing culverts within the development site.
  • Delivering a complex retirement living development incorporating residential, healthcare and communal facilities.
  • Ensuring the structural design met the requirements of a high-quality residential environment.

The engineering solution

JPS was responsible for:

  • Providing the full civil and structural engineering design for the development.
  • Designing piled foundations to overcome challenging ground conditions.
  • Developing civil engineering solutions to facilitate the required culvert diversions.
  • Designing the load-bearing masonry structural system.
  • Designing the precast floor structure and associated supporting elements.
  • Coordinating engineering solutions to accommodate residential apartments alongside communal, healthcare and welfare facilities.
  • Supporting the delivery of a high-specification retirement living development.

The outcome

  • Delivered a comprehensive civil and structural engineering solution for a £9 million retirement living scheme.
  • Enabled the successful development of a challenging brownfield site through appropriate foundation and drainage solutions.
  • Created 69 modern apartments designed for independent living with integrated care support.
  • Provided robust structural solutions that balanced efficiency, buildability and long-term performance.
  • Supported the delivery of high-quality communal, healthcare and welfare facilities for residents.
  • Contributed to the successful completion of a premium retirement accommodation development in Menston.
 

View similar case studies

Brookside Farm

Breadsall, Derbyshire

Castlewood Care home

Clitheroe

Tŷ Croes Atti

Flint, North Wales

Beaufort Court

Chester