Case Study
Visitor Centre
Location:
Denbighshire, Gwynedd
Project type:
Visitor Centre Refurbishment
Project value:
£1.4 million
Client:
Cyngor Sir Ddinbych / Denbighshire County Council
Completion:
2026
Project overview
JPS Civil & Structural Design provided structural engineering services for the refurbishment of Loggerheads Visitor Centre in Denbighshire. Working in collaboration with TACP Architects Ltd, the project focused on enhancing and modernising key areas of the visitor centre through a series of structural interventions. The scope included designing foundations for new canopies and external timber posts, introducing a new steel frame to redefine the entrance area, and providing steel beams and lintels to facilitate new structural openings. These improvements were designed to support the refurbishment works while enhancing the functionality and appearance of the facility.
The engineering challenge
The scheme presented several challenges including:
- Integrating new structural elements within an existing visitor centre undergoing refurbishment.
- Designing foundations to accommodate new canopies and external timber posts while responding to existing site conditions.
- Creating new structural openings within the building without compromising its structural integrity.
- Incorporating a new steel-framed entrance feature that aligned with the architectural vision.
- Coordinating design requirements across multiple stakeholders to ensure seamless integration of new and existing structures.
The engineering solution
JPS was responsible for:
- Designing foundations to support the new canopies and external timber posts.
- Delivering the structural design for a new steel frame to redefine and strengthen the entrance area.
- Specifying steel beams and lintels to facilitate new structural openings while maintaining stability within the existing building.
- Working closely with TACP Architects Ltd to develop coordinated and practical structural solutions.
- Providing efficient structural designs that supported the successful delivery of the refurbishment works.
The outcome
- Successfully delivered the structural design for the refurbishment of Loggerheads Visitor Centre.
- Enhanced the entrance area through the introduction of a new steel-framed feature.
- Enabled the creation of new openings to improve the building’s functionality and user experience.
- Provided robust structural support for new external canopies and timber elements.
- Contributed to the modernisation and long-term usability of the visitor centre through coordinated engineering and design solutions.