Project overview
The engineering challenge
The scheme presented several challenges, including:
• Developing foundation and retaining wall designs informed by comprehensive ground investigation to address the steep site conditions.
• Engineering a steel‑frame superstructure with light‑gauge steel infill panels to achieve low embodied carbon performance.
• Designing civil works that responded to the site’s topography, reducing material use and supporting BREEAM ‘Excellent’ aspirations.
• Collaborating closely with the architectural team to replicate the scale and character of the original 1900s school while delivering a modern, efficient layout.
• Integrating sustainable design principles aligned with Welsh Government’s Net Zero operational carbon requirements.
The engineering solution
JPS was responsible for:
• Developing foundation and retaining wall designs informed by comprehensive ground investigation to address the steep site conditions.
• Engineering a steel‑frame superstructure with light‑gauge steel infill panels to achieve low embodied carbon performance.
• Designing civil works that responded to the site’s topography, reducing material use and supporting BREEAM ‘Excellent’ aspirations.
• Collaborating closely with the architectural team to replicate the scale and character of the original 1900s school while delivering a modern, efficient layout.
• Integrating sustainable design principles aligned with Welsh Government’s Net Zero operational carbon requirements.
The outcome