Case Study

Ysgol Treferthyr

Location:

Criccieth, Gwynedd

Project type:

New-build primary school

Project value:

Circa £8 million

Client:

Welsh Government, Cyngor Gwynedd / Wynne Construction

Completion:

2024

Project overview

JPS supported Wynne Construction in the delivery of Ysgol Treferthyr, a new-build primary school in Criccieth, Gwynedd. Commissioned by the Welsh Government through the Sustainable Communities for Learning Programme, alongside Cyngor Gwynedd, the project replaced an existing 119 place school with a modern facility designed to accommodate 150 pupils.

The brief required a school that would increase capacity, enhance learning environments, and provide flexible teaching spaces, including six classrooms, a hall, kitchen, and multipurpose room. Sustainability was central to the project, with a target of achieving BREEAM Excellent alongside a requirement for a cost-conscious, low-carbon structural solution delivered within a tight programme.

The engineering challenge

The scheme presented several challenges, including:

  • Variable and complex ground conditions requiring assessment of multiple foundation solutions.
  • Integration of sustainability measures such as natural ventilation, photovoltaic panels, solar gain, and air source heat pumps.
  • Careful cost control while meeting low-carbon objectives.
  • Coordination of on-site works with off-site highways and drainage approvals.

The engineering solution

JPS was responsible for:

  • Structural engineering design of the steel frame and foundations.
  • Civil engineering design, including SUDs and ground modelling.
  • 3D modelling to support option appraisal and design development.
  • Engineering support associated with off-site highways improvements.
  • Coordination with off-site highways works and ensuring the scheme met technical, regulatory, and sustainability requirements.
  • Close collaboration with Wynne Construction, the architect, and local authorities ensured a coordinated and practical approach throughout the project lifecycle.

The outcome

  • A modern, safe learning environment for 150 pupils.
  • Coordinated civil and structural designs delivered to programme and budget.
  • Sustainability measures aligned with the project’s BREEAM Excellent aspirations.
  • Successful integration of highways and drainage improvements.
  • Positive stakeholder feedback reflecting clear communication and practical engineering input.
  • The school opened in September 2024, providing improved educational facilities for the local community.

View similar case studies

Yale Campus

Yale Campus, Wrexham

Ysgol Croes Atti

Flint, North Wales

Ysgol Ein Harglwyddes

Bangor, North Wales

Llysfasi Community hub

LLysfasi, Denbighshire

Start your project with confidence

This field is for validation purposes and should be left unchanged.
Full Name(Required)